SPECSINTACT Interagency Configuration,
Control and Coordinating Board Meeting

May 23-24, 2001
Huntsville, AL

Attendees:
Ed Gobert,
SSC
Ken Hudson, GFSC
Robert Mathis, MSFC
Jim Pratten, SGS
Pat Robinson, IDI
Tom Hinshaw, GRC
Bela Gutman, JPL
Frank Der, KSC
INTRODUCTION -Tom Hinshaw
 |
Welcomed
attendees. |
 |
Local
Construction Specification Institute (CSI) Chapter recognized NASA
for the development of SpecsIntact with a certificate. |
 |
Obtaining
the certificate will probably lead to Regional, then National recognition
from CSI. |
 |
Suggested
board members participate at their local CSI Chapters and the local
chapters should be aware of SpecsIntact and all the features of the
system. |
PREVIOUS ACTIONS
 |
Bela Gutman, JPL was tasked to identify
the unique NASA sections for possible inclusion into the Unified Facility
Guide Specifications (UFGS) database. |
 |
30%
of the NASA sections are duplicated in the UFGS database. |
| |
|
| ACTION:
|
|
Bela distribute list of unique NASA section using email to board members
and Jim Pratten.by July 2001. |
| ACTION: |
|
Bela will send the Fume
Hood Specification to Jim Pratten. (Note: Problems encountered included
SuperFund site; criteria - exclusion of earth materials; Class 1
clean).
|
SUMMARY OF MAY SI-CCCB MEETING -Tom Hinshaw
| |
|
| ACTION:
|
|
Tom
continue to bring up discussions at meetings |
SI ACCOMPLISHMENTS - Pat Robinson
MASTERSPEC/MASTERWORKS
BUILDING PRODUCT PRE-APPROVAL
PROGRAM (BPPAP)
 |
Tom
demonstrated/discussed BPPAP website. |
 |
Pre-approved
products meet Federal and Technical Requirements of Specifications. |
 |
Paint
specification and MPI standards. |
SGS PRESENTATION - Jim Pratten
 |
Briefed
SGS organization structure of SGS Design Engineering. |
 |
Hired
18 new engineers on technical staff. |
 |
NASA
will also adopt UFGS (we will provide input). |
 |
RCM
updates were completed - 59 sections. |
| |
|
| ACTION:
|
|
Bela
provide list to Jim Pratten of sections NASA will maintain. |
SUBMITTAL ISSUES
| ACTION:
|
|
Kenny
Hudson and Bela Gutman will send their local submittal definition
(13300) to Jim Pratten. |
| ACTION: |
|
SGS
to review SD-01 and apply intelligence to apply to other Submittal
Descriptions. |
SUBMITTAL REGISTER PRESENTATION
-Pat Robinson
 |
Trying
to get to one form - need board review. |
 |
Army
and Navy agreed to use Navy output in columns. |
 |
Features
- magnifier; scroll bar; right click functionality - insert rows;
validations; checking wizard; calendar, etc. |
| |
|
| ACTION: |
|
Pat distribute submittal
register file in pdf-format to board members for review.
|
SPECIFICATIONS PARAGRAPH STRUCTURE
 |
Government
numeric structure - subparagraphs may not be numbered (multiple paragraphs). |
 |
Commercial
- alphanumeric. |
| |
|
|
| ACTION: |
|
SGS - Requirement Analysis
for Master Text conversion to CSI Master format.
|
| |
|
 |
Concerns
- Maintaining Table of Contents (TOC); titles; not an automated conversion
effort without engineering judgment; investigate strategy and impacts
for conversion - i.e. phased, all-at-once; Submittal section impacts;
general section, product-heavy section, and execution-heavy section:
01330; 03300; 08100; 15050; 15720; 16145. |
| |
|
|
| ACTION: |
|
Bob email crane sections
to Jim Pratten.
|
PRESENTED PDRI - Bela Gutman
 |
Perceived
deficiency in PDRI addressing specification |
| |
|
| ACTION:
|
|
Bela
and Tom to develop letter about addressing specifications. |
| ACTION: |
|
All
centers: report number of specifications generated by SI or non-SI;
breakdown by category - discrete, minor, task, FY. |
| ACTION: |
|
SGS - List of 59 RCM
sections to Tom; SGS verify that references have also been updated
with RCM; list will prevent loss of RCM-investment in UFGS.
|
GENERAL DISCUSSIONS - Roundtable
 |
JPL
outgassing of floor materials - some colors offgas; JPL requires sample
for outgass testing; a possible example of a unique NASA spec; JPL
gave list of JPL locals as possible NASA-unique sections. |
METRICATION ISSUES
 |
Tom
related a cabinet fitting problem when A-E held dimensions to a whole
metric unit - cabinets and refrigerator had extra space. |
 |
KSC
reported one contractor's problem with metric (last year). |
 |
Tabled
due to unavailability of participation from other centers. |
SAFETY ISSUES
 |
JPL
related exterior eyewash experience in which a person was burned because
the eyewash piping was outside and use was not pre-flushed; maybe
a specification requirement for insulating exterior pipes that feed
emergency eyewash. |
 |
GRC
- related need for ganged box faceplate in which a normal faceplate
is usually trimmed about ½" to fit. |
NEXT MEETING NOVEMBER AT JSC
|